=IF(TODAY()-F2<=30,"0-30 days",IF(TODAY()-F2<=60,"31-60 days",IF(TODAY()-F2<=90,"61-90 days","over 90 days")))
The formula above works great for aging a report I have based on today's date of 7/9/2014. However the report was prepared on 7/1/2014, so I need to age based on 7/1/2014. How can I...